亚洲AV无码乱码国产精品久久,91精品啪国产在线观看,成年入口无限观看免费完整大片,亚洲蜜桃AV永久无码精品放毛片,国产无码网页在线观看
Hello, welcome to Jinan Huawei CNC machinery CO., Ltd

National Advisory Service Hotline

Advanced Search:


Contact us


contact us

Contacts:JI Manager

Unified hotline:400-6587-688

Tel: (86)531-88276988

Fax:(86)531-88276988

Phone number:0086-15269186223

Address: No.18 Tonghua Road ,

Licheng district , Jinan city, 
shandong province, China



Company news
Your Current Location :HomeNEWSCompany news  ? How to install the side hole machine

How to install the side hole machine

Source: Time:2024-06-15 09:13:24 views:

The installation steps for the side hole machine are as follows: 1. Determine the placement position of the machine and ensure. Connect the power supply to three-phase AC according to the rated voltage indicated on the machine nameplate (note

The installation steps of the side hole machine are as follows:

1. Determine the placement position of the machine and ensure. Connect the three-phase AC power supply according to the rated voltage indicated on the nameplate of the machine (pay attention to safe use of electricity), and ground it properly; Before use, check the integrity of various components such as the oil level in the motor gearbox and the proper functioning of the switchgear. 2. Use a wrench to unscrew the chuck on the spindle and install the screws on the guide rail after removing the cover plate. 3. According to the requirements of the machining center, drill templates and punch needles should be inserted into the host and fixed (optional brackets can be selected). 4. Place the products that need to be punched on the conveyor belt, and then the mold closing production robot arm should grasp the products and align them with the positioning to achieve the required depth (if generally not adjusted, simply rotate them clockwise by hand). 5. Before operating the equipment, a no-load test should be conducted to confirm whether there is any leakage of the fully automatic function. If any is found, timely adjustments should be made to ensure normal operation without errors. 6. The noise and temperature rise of the equipment must meet the specified requirements. 7. During the debugging process, parameters should be set according to the actual working conditions to meet the process requirements. 8. Training and guidance should be provided to operators before they can be put into normal production operations to avoid unnecessary failures or safety hazards--- Please ensure the safety and stability of the environment before proceeding with the next steps of the operation process. If necessary, seek help from personnel~

keys: 
亚洲AV无码乱码国产精品久久,91精品啪国产在线观看,成年入口无限观看免费完整大片,亚洲蜜桃AV永久无码精品放毛片,国产无码网页在线观看